24 giugno 2025
NEWS
As of June 18, 2025, Dulcop’s registered office is now located in Castel San Pietro Terme, Bologna. A strategic move to strengthen the company’s identity, sustainability, and innovation potential.
Dulcop International S.p.A. has officially transferred its registered office to its new integrated headquarters at Via Lombardia 48, 40024 Castel San Pietro Terme (BO), Italy.
This milestone marks the completion of a major structural evolution, which began in January 2024 with the relocation of the production plant to the new site.
The new facility stands as a concrete example of industrial efficiency and sustainable innovation, thanks to a layout designed to reduce waste and foster synergy across departments:
- All production lines are now located on a single level, enabling a faster, more streamlined flow from raw materials to shipping.
- Packaging and other manual operations are now centralized in one location.
- Automated vertical warehouses optimize space, time, and safety, ensuring a continuous supply to the lines without the need for on-site personnel.
Dulcop reinforces its identity as a Made in Italy company: cohesive, transparent, and future-focused.
Bringing together production, governance, logistics, and creativity under one roof is not just a logistical decision — it is a symbolic one. Every bubble is now born in a place designed to protect, innovate, and grow, in full alignment with our ESG strategy.